Day 1 was productive but not overly so. I didn't venture into the shop to work on cabinets because I feared that would take too much of my attention away from Atticus and Trissa. Most likely I'll start on the doors and drawers on Monday when they're at daycare and work.
Trissa and I worked together on two projects today. The ...
-
It’s been a long time coming: we now have serious lighting in our living / dining areas. This weekend I installed 16 recessed 4” cans and wired them to 3 new ASPIRE dimmer switches. It was a lot of work, and my neck is pretty stiff from working overhead on the ladder.
I actually started installing the cans themselves earlier ...
|
|
|