|
|
Browse by Tags
All Tags » Future Kitchen » 1st Floor Renov... » Vacation
Sorry, but there are no more tags available to filter with.
-
The drawer's are 95% done. The boxes are all built and sanded, and four of them are installed and operating, sans drawer fronts. I need more drawer slides and I'm going to order them from an online supplier tonight or tomorrow. This morning Trissa, Atticus, and I got up and headed over to Rockler at 8AM. We bought two ...
-
Today was the least productive day so far. It's about 6pm and I haven't yet gone into the shop. I doubt I will make it.
All's not lost. As I write, Trissa is working on list item #7, ''3 interior doors''. This morning we set up a second set of sawhorses so we could get two doors going at once, and she's on her ...
-
I woke up at my usual time this morning, as if I were going to work. I was going to work, but not downtown - down in the basement. Once I got Trissa and Atticus out the door and on their way to daycare and school I sat down for a brief planning session over my morning coffee.
I knew the main thing I needed to get done today were the ...
-
I woke up this morning feeling pretty under the weather. So much so that I went back to bed and didn't get up until 11. I didn't much feel like working on the house, but sometime after lunch I forced myself into the shop to work on cabinet doors.
Last night we went to our friends Scott and Heidi's house for dinner. This was the ...
-
As of 4:30 today I am officially on vacation until the 27th of November! This is my second week-long vacation in 2 months and I'm happy to have it - Atticus isn't getting any LESS-mobile, and our house needs to be child-proofed. In our case this primarily means one thing: cabinet doors.
My dad and I started the cabinet doors ...
|
|
|