|
|
Browse by Tags
All Tags » Future Kitchen » Windows » 1st Floor Renovation
-
(Several of these are left over from 2007)
Replace all the windows. (One down, six to go on the 1st floor. Eight on the 2nd.)
Kitchen 100% done.
Pay someone to replace the roof.
Finish removing the asbestos siding.
Strip, prep, and paint the exterior.
Living and dining room built-ins.
Laundry chute.
New wiring ...
|
|
|